MnDOT I-494/TH 169 Interchange

 

 

Company
KRAEMER NORTH AMERICA
Facility Type
Roads/Tunnels/Bridges
Location
Bloomington, MN
Start Date
11/2010
End Date
11/2012

 

 

PROJECT DESCRIPTION

JV Project (Kraemer North America & 'McCrossan)

Kraemer reconstructed the interchange at I-494 and TH 169 as the design-build contractor leading this urban interchange reconstruction project through the Minneapolis Metro Area. The project included connecting the north and south frontage roads under TH 169 and converting TH 169 from an expressway to a freeway with a partial direction interchange at I-494. The design-build team worked together to develop several cost-saving innovations, including shifting a ramp location to eliminate the need for a new bridge, which saved the project approximately $5.9 million.

 

 

 

 

 

OTHER PROJECT (By )

No result.