Whitby GO Parking Structure - Design Build

 

 

Company
KENAIDAN GROUP
Facility Type
Retail/Entertainment
Location
1350 Brock Street South, Whitby, ON
Start Date
07/2008
End Date
02/2010

 

 

PROJECT DESCRIPTION

The 4-level parking structure provides a total of 1,392 parking spaces for GO patrons. The project was a design build effort with Kenaidan Contracting Ltd. and Read Jones Christoffersen (RJC) partnering through design and construction.

4-level parking structure providing 1,392 spaces for GO patrons. Kenaidan self-performed concrete & formwork. The superstructure includes 4 levels of exposed aggregate pre-cast elements, a feature stair tower & enclosed pedestrian walkway linking the facility w/the existing Entrance. This is the 2nd parking structure that GO has awarded to the Kenaidan/RJC team.

 

 

 

 

OTHER PROJECT ( )