Silver Lake Reservoir Complex Storage Replacement Project CM-at-Risk Contract

 

 

Facility Type
Waterworks
Location
Los Angeles, CA
Start Date
01/2012
End Date
12/2017

 

 

PROJECT DESCRIPTION

CM-at-Risk contract for preconstruction services and construction management for two buried concrete drinking water reservoirs (54 and 56 million gallon capacity), covered with soil and vegetation; a 4-megawatt hydroelectric power plant; a 250 cfs capacity flow regulating station; and 96" diameter by 6,600' long pipeline with 3,000' in tunnel. Located in urban Los Angeles. Covered drinking water storage and hydroelectric power generation.

 

 

 

 

OTHER PROJECT ( )