Upper Diamond Fork Tunnel and Pipeline Design/Build, Phase 2

 

 

Facility Type
Waterworks
Location
Springville, Utah
Start Date
04/2002
End Date
06/2004

 

 

PROJECT DESCRIPTION

5,200' of 12'6" bored TBM water tunnel in rock (sandstone, siltstaone), lined with 6,000 lf of 8' dia. steel pipe. Hydraulic and flow control structures, system controls, access roads, site restoration. Continuation of Phase I (Ref No. 48) which alignment was modified due to hydrogen sulfide gases in water. Irrigation.

 

 

 

 

OTHER PROJECT (By OBAYASHI CORP. - North American Civil -)